Investor: WIND PARK PLANDIŠTE d.o.o.
Installed power: 102 MW
Windturbine number: 34
Windturbine type: Vestas V136 - 3,45/3,6 MW (limited on 3,0 MW)
Design documentation:
Investor: Energo-Dolovo Jedan d.o.o.
Installed power: 9,9 MW
Windturbine number: 3
Windturbine type: Siemens SWT3,2 - 113
Design documentation:
Investor: Energo-Dolovo Jedan d.o.o.
Connection point: TS 110/20 kV Pančevo 4
Voltage level: 20 kV
Cable lenght: 13,375 km
Projektno-tehnička dokumentacija:
Investor: Wellbury-Bela Anta d.o.o.
Installed power: 120 MW
Windturbine number: 35
Windturbine type: Vestas V126 - 3,45 MW
Projektno-tehnička dokumentacija:
OBTAINING PERMITS
Responsible authority: Provincial Secretary for Urban Planning and Environmental Protection
Construction permit changing because of new wind turbine applied:
Responsible authority: Provincial Secretary for Urban Planning and Environmental Protection
Responsible authority: Provincial Secretary for Urban Planning and Construction
FEASIBILITY STUDIES
BUSINESS PLANS
CONTRACTING
POWER PLANT CONNECTION ANALYSIS
LOCATION ANALYSIS / POWER PLANT CONFIGURATION