Our most important references

OUR COMPANY UNTIL NOW

Having worked with a lot of dedication and effort on our projects has achieved the following results: 

14

Number finished projects

250

Installed power of projects [MW]

39

Number of obtained permits

MAKING DESIGN DOCUMENTATION

  • WINDPARK PLANDIŠTE - 102 MW

    Investor: WIND PARK PLANDIŠTE d.o.o.

    Installed power: 102 MW

    Windturbine number: 34

    Windturbine type: Vestas V136 - 3,45/3,6 MW (limited on 3,0 MW)

    Design documentation:

    • Design changes of design for construction permit
    • Excerpt from design for construction permit 
  • WINDPARK DOLOVO 1 - 9.9 MW

    Investor: Energo-Dolovo Jedan d.o.o.

    Installed power: 9,9 MW

    Windturbine number: 3

    Windturbine type: Siemens SWT3,2 - 113

    Design documentation:

    • Preliminary solution
    • Preliminary design
    • Design for construction permit
    • Excerpt from design for construction permit
  • PRIKLJUČNI VOD SA RASKLOPNIM POSTROJENJEM (VP DOLOVO 1)

    Investor: Energo-Dolovo Jedan d.o.o.

    Connection point: TS 110/20 kV Pančevo 4

    Voltage level: 20 kV

    Cable lenght: 13,375 km

    Projektno-tehnička dokumentacija:

    • Idejno rešenje
    • Idejni projekat
  • WINDPARK BELA ANTA - 126 MW

    Investor: Wellbury-Bela Anta d.o.o.

    Installed power: 120 MW

    Windturbine number: 35

    Windturbine type: Vestas V126 - 3,45 MW

    Projektno-tehnička dokumentacija:

    • Idejno rešenje
    • Idejni projekat
    • Projekat za građevinsku dozvolu
    • Izvod iz projekta za građevinsku dozvolu

OBTAINING PERMITS

  • WINDPARK PLANDIŠTE - 102 MW

    Responsible authority: Provincial Secretary for Urban Planning and Environmental Protection

    Construction permit changing because of new wind turbine applied:

    • Submit all necesary documentation for construction permit changing
  • WINDPARK DOLOVO 1 - 9.9 MW

    Responsible authority: Provincial Secretary for Urban Planning and Environmental Protection

    • Podnošenje potrebne dokumentacije za dobijanje lokacijskih uslova
    • Podnošenje potrebne dokumentacije za dobijanje građevinske dozvole
    • Prijava radova
  • WINDPARK BELA ANTA - 120 MW

    Responsible authority: Provincial Secretary for Urban Planning and Construction

    • Podnošenje potrebne dokumentacije za dobijanje lokacijskih uslova
    • Podnošenje potrebne dokumentacije za dobijanje građevinske dozvole
    • Prijava radova

FEASIBILITY STUDIES

  • WINDPARK PLANDIŠTE - 102 MW
    • Excerpt from Preliminary design for new decision of Institute for Nature Conservation of Voivodina Province
  • WINDPARK BELA ANTA - 120 MW
    • Pref-feasibility study with general design
    • Feasibility study
  • WINDPARK KRUŠČICA - 9.9 MW
    • Feasibility study with yield assesment

BUSINESS PLANS

  • WINDPARK BELA ANTA - 120 MW
    • Business plan (English language) with all necesary elements for project financing.
  • WINDPARK DOLOVO 1 - 9.9 MW
    • Business plan (English language) with all necesary elements for project financing.
  • WINDPARK KRUŠČICA - 9.9 MW
    • Business plan (English language) with all necesary elements for project financing.

CONTRACTING

  • WINDPARK DOLOVO 1 - 9,9 MW
    • Usaglašen Ugovor o isporuci i izgradnji vetroturbina sa SIEMENS-Gamesa
    • Usaglašen Ugovor o održavanju sa SIEMENS-Gamesa

POWER PLANT CONNECTION ANALYSIS

  • WINDPARK BELA ANTA - 120 MW
    • Analiza postojećeg stanja
    • Podnet zahtev operatoru prenosnog sistema za izdavanje mišljenja o mogućnostima priključenja
    • Pregovaranje sa operatorom prenosnog sistema oko optimalnog priključka vetroelektrane
    • Podnet zahtev operatoru prenosnog sistema za izdavanje studije o mogućnostima priključenja
       
  • WINDPARK DOLOVO 1 - 9,9 MW
    • Analiza postojećeg stanja
    • Podnet zahtev operatoru distributivnog sistema za izdavanje mišljenja o mogućnostima priključenja
    • Pregovaranje sa operatorom distributivnog sistema oko optimalnog priključka vetroelektrane
    • Podnet zahtev operatoru distributivnog sistema za izdavanje studije o mogućnostima priključenja
       

LOCATION ANALYSIS / POWER PLANT CONFIGURATION

  • WINDPARK BELA ANTA - 126 MW
    • Određene pozicije vetroturbina
    • Usklađene pozicije sa aspekta zaštite životne sredine
    • Definisani kablovski izvodi
    • Određena optimalne trase kablovskih vodova
    • Određeni optimalni poprečni preseci kablovskih vodova sa aspekta gubitaka el. energije na svim deonicama svih izvoda 
  • WINDPARK DOLOVO 1 - 9,9 MW
    • Određene pozicije vetroturbina
    • Definisani kablovski izvodi
    • Određena optimalne trase kablovskih vodova
    • Određeni optimalni poprečni preseci kablovskih vodova sa aspekta gubitaka el. energije na svim deonicama svih izvoda
  • WINDPARK KRUŠČICA - 9,9 MW
    • Određene pozicije vetroturbina
    • Definisani kablovski izvodi
    • Određena optimalne trase kablovskih vodova
    • Određeni optimalni poprečni preseci kablovskih vodova sa aspekta gubitaka el. energije na svim deonicama svih izvoda